







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ActiveYards Fence Installation: The Orange County Owner’s Guide
ActiveYards fence installation in Orange County typically runs $3,500 – $9,000 for a full residential project, with most homeowners paying around $5,500 for roughly 100 linear feet of aluminum or vinyl fencing. We stock ActiveYards-compatible posts, rails, gates, and hardware on our service vehicles and can match your existing fence line in most Orange County neighborhoods the same week you call. The symptom that usually brings owners to this page isn’t subtle: a gate that drags on the concrete, a post that tilts after irrigation season, or a rail that popped loose after a Santa Ana wind event and now won’t seat back into the bracket.
ActiveYards builds its fence systems differently than the big-box off-the-shelf panels you’ll find at a lumber yard. The posts are heavier-gauge, the rails lock into routed slots rather than surface screws, and the pickets are engineered to interlock. That’s good for longevity, but it also means a failed component is rarely a one-size-fits-all swap. We’ve replaced enough of these in Irvine’s Turtle Rock and older Tustin tracts to know exactly which parts are model-specific and which are universal across the line.
Which ActiveYards Models This Applies To

ActiveYards manufactures its fencing under three primary product lines: ActiveYards Aluminum, ActiveYards Vinyl, and the ActiveYards Sierra line (a vinyl-wrapped aluminum core for higher wind zones). Within each line, the company offers several series – including the Signature series, the Classic series, and the Premier series – and the rail brackets, post caps, and gate hinges are series-specific. The most common compatibility mistake we see is a homeowner ordering a Classic-series rail bracket for a Premier-series fence, or vice versa. The bracket looks nearly identical, but the rail channel depth is off by 3/8 of an inch.
How to identify what you have: look at the inside face of any post cap or the bottom rail. ActiveYards stamps the series name and a date code on most components made after 2012. If the stamp has worn off, measure the rail width. Classic series rails run 1.5 inches wide; Premier series rails are 2 inches. The Sierra line has a visible aluminum channel inside the vinyl profile. We carry OEM ActiveYards replacement parts as well as quality aftermarket equivalents from U.S. Fence & Gate and Superior Plastics, which shave roughly 20 – 30% off the OEM price without sacrificing fit. For gate hardware, we recommend staying with OEM or the Selden line – the aftermarket copies we’ve tested in coastal cities like Newport Beach and Huntington Beach corrode at the hinge pin within two years of salt exposure.
Styles & brands we work with







Signs Your ActiveYards Fence Installation Is Failing
- The gate drags or won’t latch. Usually a sagging hinge post, not a bad gate. In Orange County’s clay-heavy soils, posts shift after winter rain cycles and the gate frame follows. You’ll see a wear mark on the latch side concrete where the gate used to clear it.
- Rails pop out of the bracket after wind. The spring clip inside the bracket has fatigued. This is the single most common ActiveYards failure we replace. Santa Ana winds in Yorba Linda and Anaheim Hills accelerate it because the rail flexes repeatedly against the clip.
- Post wobbles at the base. The post footing has cracked or the post wasn’t concreted deep enough originally. Orange County code requires a minimum 24-inch footing depth for fence posts, but plenty of early-2000s tract-home fences were set at 18 inches.
- Pickets have shifted or buckled. Vinyl expands and contracts with our 40-degree temperature swings between inland summer and winter nights. If the original installer didn’t leave expansion room at the post channel, pickets bind and warp.
- White powder or rust staining at joints. On aluminum fences near the coast, this is galvanic corrosion where stainless fasteners met uncoated aluminum. Laguna Niguel and Dana Point fences are particularly prone. The fix is replacing the affected section and switching to nylon-isolated hardware.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a full ActiveYards fence installation in Orange County, you’d be looking at $3,500 – $9,000 depending on the linear footage, gate count, and whether you’re matching an existing series or starting fresh. A partial repair – say, replacing six failed rail brackets and resetting two posts – usually lands between $400 and $1,200. A full gate replacement with new hardware runs $600 – $1,800 installed.
Every installation we do includes removal and haul-away of the old section, concrete footing work where the posts are set, new brackets and hardware matched to your ActiveYards series, and a written price before any work starts. That written number includes parts, labor, and a 365-Day Done Right Promise: if anything we install fails inside that year, we come back and repair it at no charge. No re-inspection fee, no service call. You’d get that guarantee in writing on day one, not as a verbal assurance.
Here’s what drives the price up or down:
- Series and material: Sierra line (wind-rated for canyon areas) costs more than Classic vinyl. Aluminum costs more than vinyl. Premier series sits in the middle.
- Gate count and width: A 5-foot walk gate with standard hardware is straightforward. A 12-foot double drive gate with a Selden post-and-hinge system adds several hundred dollars in hardware alone.
- Post removal: If the old post concrete is a 36-inch-deep pour (common in HOA-governed communities like Rancho Santa Margarita), extraction takes longer than a standard 24-inch footing and the labor reflects that.
- Access: Fences along hillside lots or behind retaining walls in places like Mission Viejo require hand-digging and material carry-in, which adds to the total.
DIY or Call Us?
Honest answer: fence replacement is not a high-tension hazard like a garage spring, but it is a job where the third hour determines whether the fence survives the first Santa Ana season. You can safely check the series stamp, measure your rail width, and photograph the damage before calling. What’s harder to get right on your own: digging the new footing to the correct 24-inch minimum depth, leveling a post in three planes before the concrete sets, and setting rail expansion clearances correctly. We’ve reset more DIY posts than we can count, and most of them failed because the concrete was mixed too wet and the owner set the post before the footing was packed properly. Give you the number first, then pick up the tool. If you’d rather hand the tool to someone who does this weekly, call (424) 541-1701 and we’ll give you a written quote before anything gets dug.
FAQs

An ActiveYards fence built on proper 24-inch footings with correct expansion clearances lasts 20 – 30 years in most parts of Orange County. Coastal fences take a roughly 5-year lifespan hit from salt air on the hardware, and south-facing vinyl sections in inland cities fade faster from UV exposure. The most common mid-life failure is the spring clip in the rail bracket at the 8 – 12 year mark, not the fence panel itself.
Yes, when the rail itself is intact and the problem is a fatigued bracket clip, we replace the clip and reseat the rail. When the rail has buckled from heat expansion, it’s usually cheaper to replace the rail section than to heat-bend it back – and the bend almost always returns. Call (424) 541-1701 and describe what you’re seeing; most bracket-clip repairs take under an hour.
A typical 100-linear-foot replacement with one gate takes two full days in Orange County: day one for demo and post excavation, day two for panel installation, gate hanging, and cleanup. Partial repairs like rail brackets or a single post reset are usually done in an afternoon. We’ll give you a defined arrival window before we start, and the crew leaves the site cleaner than they found it.
We stock the most common ActiveYards components on our trucks: rail brackets in both series sizes, post caps, picket clips, hinge sets, and latch hardware. Less common items – like a custom-color Sierra panel or a specific gate frame – take 5 – 10 business days to source. If we have the part on hand, we can often complete the repair the same visit. Our parts room also carries components for other trade brands we work with, including KraftMaid, Cambria, and Silestone, so we’re used to matching specific manufacturers rather than whatever’s on the shelf at the store.
No. You’ll get a written price before we begin based on what we can see and measure. If we uncover something unexpected underneath the surface – an old concrete footer that needs additional hammering out, for example – we stop and give you a written change before any of our work exceeds the original number. The price you sign is the price you pay, or we tell you why it’s changing before it changes.
Written by Trevor Nash, Owner, Penhallow Remodeling Orange County, serving Orange County and nearby areas. Trevor learned the trade at Los Angeles Trade-Technical College and has spent years working with his crew throughout Irvine, Tustin, and the older residential neighborhoods near the Spectrum, where 1980s and 90s fences are reaching the end of their service life. We’re an independent service provider and are not affiliated with ActiveYards.


